Fast. Compliant. Tested. Why In-House QA Matters More Than Ever

Your project plan breaks where testing queues begin. In-house QA closes that gap.

What you get with in-house QA

Shorter critical path

Routine tests happen the same day on our floor—no lab slots to chase. For transformers and instrument transformers, that means winding resistance, ratio & vector group, load/no-load losses, dielectric withstand, and leak tests as per IEC 61869 / IS 16227.

Compliance that travels with the product

Instrument transformers (CT/PT) are validated to relevant IEC/IS standards, so acceptance at site aligns with what’s already proven at the factory.

Fewer site surprises

We complete witnessable FATs before dispatch. Catching integration or settings issues at the factory reduces commissioning time and rework at site.

Clear acceptance for panels and cubicles

LV assemblies are built and verified against IEC 61439—so your metering cubicles arrive with type-tested design evidence and routine test records ready for utility checks.

Traceability your QA team can trust

Each unit leaves with a test pack: measured values, curves (CT ratio error / phase angle at burden, VT checks), insulation readings, and witness notes—aligned to IEC/IS clauses your client will ask for.

Why this matters to you

  • Faster dispatches → your milestone dates hold.
  • Pre-qualified compliance → fewer approval loops.
  • Lower risk → reduced rework, fewer NCRs at site.
  • Smoother handover → documentation matches utility expectations.

Paras Power builds QA into production so your project moves from PO to energization with fewer stops.